Okgye main plant is an integrated plant of Halla Cement with the latest four production lines, of which capacity is 6.6 million tons in clinker production. Equipped with the newest NSP type kiln, the main plant runs the waste heat recovery system, and the two way conveyor belt connected our harbor plant. Our harbor plant, located in our exclusive harbor, operates a cement grinding facility and seaborne logistics system which makes us ship our products easily and cost effectively. In a nutshell, Halla Cement holds a complete integrated distribution network covering in-land road, railway, and seaborne transport that leads to customer needs.
Okgye Main Plant | Location | 225, Sangye-gil, Okgye-myeon, Gangneung-si, Gangwon-do, Republic of Korea |
---|---|---|
Production Volume | Clinker: 6.6 million tons/year Cement: 1.2 million tons/year |
|
Okgye Harbor Plant | Location | 557, Jusu-ri, Okgye-myeon, Gangneung-si, Gangwon-do, Republic of Korea |
Production Volume | Cement: 6.4 million tons/year |
Okgye Main Plant(1)
Okgye Main Plant(2)
Okgye Harbor Plant